Templates โ€บ Safe Work Method Statement (SWMS)

โš ๏ธ Safe Work Method Statement (SWMS)

Document high-risk construction work activities, hazards, and control measures โ€” required under NZ H&S regulations.

How to use: Complete a separate SWMS for each high-risk task before work starts. All fields are editable โ€” click any text to change it.

Your logo here
SAFE WORK METHOD STATEMENT
SWMS #: SWMS-001
Date: 2026-01-01
Job: Job description / address

Health & Safety at Work Act 2015. Complete a SWMS for each high-risk construction work activity. Workers must read and sign before starting.

Business Name
Site Address
Describe the high-risk work (e.g. working at heights, excavation, demolition, electrical work)
Task StepHazard / RiskLikelihoodControl MeasureResidual Risk
Step 1Describe hazardHigh/Med/LowControl measure to eliminate or minimiseLow
Step 2
Step 3
Step 4
Step 5
Hard hat, hi-vis vest, safety boots, gloves, safety glasses, harness (if working at height)
Emergency contact: [Name / Phone]. First aid kit location: [Location]. Nearest hospital: [Name / address].
NameRoleSignatureDate

More Free Tools for NZ Tradies

Job Cost Calculator

Calculate labour, materials and GST

GST Calculator

Add or remove 15% GST instantly

Hourly Rate Calculator

Work out what you should be charging